A concrete batching plant is a combined device for centrally mixing concrete, also known as concrete precast field.
With the development of municipal and construction industries, the advantages of concrete batching plants are becoming more and more prominent, and the development is getting faster and faster. Concrete pumping construction realizes the working mode of mixing, conveying and pouring, which greatly improves the work efficiency.
However, the construction of a concrete batching plant is a relatively large project, and there are many things that need to be paid attention to during the construction process, and also need to be understood. Here are some suggestions for you, I hope it can help those who need it.
1. Familiar with the construction address and construction site route
Familiar with the route direction of the construction site is one of the important links in the construction of the concrete batching plant. Because the transportation distance of concrete, that is, transportation time, will directly affect the quality of concrete.
Therefore, the construction of the concrete batching plant needs to be considered in the whole process to meet the needs of the site. Before determining the address, it is necessary to be familiar with the traffic conditions in the intersection area of the construction line, and confirm the distribution of concrete uses according to the construction drawings, to determine the approximate location of the concrete mixing plant.
2. Understand and master the basic elements of mixing plant construction
The construction of a mixing plant needs to consider basic factors such as water, electricity, and floor space.
Water is one of the basic elements in the production of finished concrete. Don't build a station where there is no water source or too far from it. Areas with water sources should take samples in advance and send them to testing stations for water quality testing.
Electricity is also one of the essential elements for producing finished concrete. When considering the environment, consideration should be given to choosing a location that is close enough to energize the site.
There are other major facilities that need to be considered: batching plant production area, aggregate storage area, power distribution and control area, living area, green area, transportation channel and so on.
3. Familiar with the surrounding environment of the construction site
The concrete batching plant is the place where concrete is produced. The degree of construction mechanization is high, and the dust and noise pollution are relatively large. When selecting the site, do not be close to residential areas, schools, planting bases and other areas where people and livestock are concentrated, to avoid complaints from the surrounding areas. At the same time, some measures should be taken to reduce dust and noise pollution and minimize external factors.